
Claverton Pumping Station have launched an online appeal for funds after suffering 17 floods between October 2023 and April 2024. The aim of the appeal is to replace rotten timber, and to make the site’s operations more flood resilient. The Grade I listed building was restored by volunteers between 1969 and 1976, and is maintained and run by the volunteers of The Claverton Pumping Station Trust CIO, though it is owned by the Canal and Rivers Trust.
Claverton Pumping Station was built between 1809 and 1813, to a design by the engineer John Rennie, to overcome problems of water supply for the Kennet and Avon Canal near Bath. A 17 foot (5 m) diameter by 24 foot (7 m) wide water wheel powers a large beam engine that pump 50 gallons of water every two seconds from the River Avon up 48 feet into the Kennet and Avon canal. The pump operated from 1813 until 1952. It is the only working example of a waterwheel-driven pumping station on the national canal network.
The Claverton Pumping Station Trust observed that ‘as flooding is predicted to become more frequent and more severe having extra money ring-fenced for flood repairs and flood resilience will allow us to continue proactive maintenance and to make timely repairs when necessary.’
For details on how to give follow this link: https://justgiving.com/campaign/claverton-floods

